Canal Naval Constructions Co. (CNCC) and Port Said for Engineering Works Co. (PSEW) are two of the Suez Canal Authority (SCA) affiliated companies founded in 1963 well equipped and efficient for building and repairing aluminum and steel vessels.
As of 4/1/2022, The Suez Canal Authority issued a Resolution to merge “Port Said Engineering Works Co.” and “Canal Naval Constructions Co.” into one company (Egyptian joint-stock company) under the name ” Port Said Engineering Works & Naval Constructions Co.” (PSEWNC). As a public sector company affiliated with the Suez Canal Authority
It was chosen for its supreme strategic location at Egypt’s Northern entrance of Port Said city gives it the advantage to cover massive maritime areas. The shipyard can convert the Ro / Ro ships to passenger ships.
The quay at the shipbuilding area has 200 meters in length & quay at the ship repair area is 150 meters and growing. The South quay is a base operation for petroleum search companies, also PSEWNC is planning to build a new floating dock with a lifting capacity up to 5000 tons.
PSEWNC is a shipyard with modern facilities and a highly-skilled workforce of more than 500 people. We have designed, built, and delivered more than 550 highly versatile vessels, which are in service with Suez Canal Authority, Egyptian Port Authoritarian, and governmental companies.